Front Of Building Work Project Details

Last Updated 10/15/2006

back to Heinz Homepage

back to building remodeling overview

Left: the front of the house before the concrete work.

 

Right, Bottom Left, and Bottom Right: September 2005, work on the ramp and retaining walls for the basement.  We did this section in 10 pours and made about 18 yards of concrete.  The girls only made it for 2 of the pours because school had started.  But Noah either finished school early (by 10am) or doubled up on the days we were forming so that he could make all the pours.  Forming was tricky because we had the access shaft (the plywood box below) to the septic tank and the septic line running through our concrete.

Above: Byeram standing on the completed ramp.  You can see the patio where we will build a small guest house in the future, the stairs, and the entry walkway.   Below: The front of the church with grass, tree, and flowers.

Above:  Amanda near the gates.  The grey steel panel in the ramp is the access shaft to the septic tank.   We finished the outside work in late September 2005.  The next project was the basement floor. 

See: Basement for details.